:quality(70))
Installing Kährs Luxury Tiles vinyl floors is designed to be efficient and hassle-free. Our Click-joint system allows for a fast, floating installation with a secure, precise fit—ideal for projects that need minimal downtime. For high-traffic or commercial areas, the glue-down method with Kährs Dry Back floors provides extra stability and durability.
To achieve the best results, follow our step-by-step installation guide and preparation tips. With Kährs, you get a seamless, stylish, and long-lasting vinyl floor—installed with ease.
:quality(70))
Proper preparation is key to a successful installation of Kährs Luxury Tiles.
Temperature control: Ensure both the room and flooring materials are kept between +18°C and +25°C for at least 24 hours before installation.
Subfloor requirements: Kährs Luxury Tiles can be installed over most clean, dry, solid, and level subfloors. Remove any wall-to-wall carpeting or similar coverings.
Moisture management: If installing over concrete, the relative humidity (RH) must not exceed 85%.
Underfloor heating: If using a glue-down method over underfloor heating, turn off the heating system during installation and drying time. UFH must be gradually turned up over time after installation.
Following these guidelines ensures a stable, long-lasting installation. Read more about preparation steps before getting started.
Install the boards lengthways to follow the room’s natural proportions.
For Click vinyl floors, maintain a 10mm expansion joint around the perimeter to allow for natural movement. Ensure the floor remains unrestricted, avoiding heavy fixed furniture that could limit its flexibility.
:quality(70))